Steel
Holding-down bolts
Bolt groups, packers and grout as-set before the steel. The record the erector and the designer both need.
DRG. 04 — Work
We do not invent testimonials. These are the kinds of jobs we actually turn up for — anonymised, because the site is the client’s, not a case-study factory.
Steel
Bolt groups, packers and grout as-set before the steel. The record the erector and the designer both need.
Concrete
Line and level for walls, pile caps and pours — as-set before the concrete goes in, not after.
Steel
Grid and as-set for a steel lift — the frame goes in where the drawing says, on a possession window.
Steel / concrete
Setting out and as-built on a live bridge: steel, concrete abutment, instrument on the scaffold.
Steel
Line and level for racking, rails and steel inside a live warehouse — tight tolerance, existing floor.
Steel
As-set of a steel span onto concrete — night working, one window, no second lift.
Earthworks
Repeat surveys to track cut, fill and stockpiles against design — a volume pack the site and the QS can both use.
Earthworks
Clean 3D surfaces issued to GPS plant so grading follows the design without a forest of profiles.
Structures
Line and level for culvert installs, drainage, road forms and concrete — including the road closure window, not after it.
Temporary works
Targets fixed to sheet piles and observed through the excavation. Movement recorded; no surprises for the temporary-works designer.
Temporary works
Daily scan visits on an embankment in West Northamptonshire, reported against agreed trigger levels.
Land / energy
Targeted topographic update for a farmland solar design, including tree heights, so the scheme did not need a full resurvey.
If you have a similar brief — earthworks progress, a solar topo, a monitoring spec or a setting-out window — send it through.